What a whirlwind week we’ve had.  When we last left you, the foundation repairs had started.  The steel supports were delivered and a few of the damaged sills were replaced.

That was child’s play compared to where we are now.  In fact, things are progressing so quickly, that what you’re currently reading is old news (well, to us anyhow).

Thankfully the weather has been on our side – for a change.  With an exception of one rain-day last week, it’s been non-stop progress.  So with that said, here’s how the last few days went:

After the sills were replaced, the soil was cut down around the house and stones removed from the foundation to make pockets for the big steel beams to be installed.

IMG_2456

Picking up one end with the excavator and slowly guiding it through the pockets in the foundation, the beam is pushed from the back of the house, with only inches to spare….

IMG_2458

….out through the front of the house.

IMG_2468

Needless to say, Elmer has done this once or twice before.  Now for the second beam.

IMG_2476

IMG_2480

So that takes care of the main cape.  The kitchen ell has two smaller supports perpendicular to the two mains.  These will be jacked by hand.

IMG_2483

But the two main supports will be raised pneumatically.  With the cribbing and jacks in place, it’s time to start lifting.

IMG_2485

IMG_2497

There she goes!

IMG_2498

Front-to-back, the main beams are raised and the side supports are jacked manually to keep pace.

IMG_2507 IMG_2513 IMG_2515

Murdoch’s such a trooper, too.  He’s happy just to be out with us and the guys from Moveall Structures.  Of course, anytime he gets attention, he’s happy.

IMG_2525

And there it is.  The house is up a couple of feet off the old foundation wall and the next step is to remove the old stone wall and excavate to a depth to accommodate the new full-height basement.

IMG_2542

Unfortunately, Thursday is where the week ended for the crew.  Rain came on Friday and the remaining excavation would have to wait until after the weekend.

But, in spite of the rain, Friday was just what we needed.  Our good friends, Aarno and Helena were passing through the maritimes on their way back to Ontario and paid a visit.  How awesome to see old friends and familiar faces – and to share a glimpse in what we’re doing.  We went for a quick drive along Cavendish and stopped for lunch at the Blue Mussel Cafe in North Rustico.

IMG_2531

Vanessa with Helena and Aarno

It was there we met Steve, the new owner of the restaurant.  He and his wife just moved to PEI last year, looking for a change of pace and had just opened the restaurant for the season only six days earlier.  And to top it off, they were originally from Ajax – practically neighbors to us in Ontario!  If you ever find yourselves in the area, I’d certainly recommend their cafe.

The day off was more than a welcome change.  It was entirely necessary.   During the week of the foundation work, we were digging and preparing the vegetable gardens.  Vanessa was raking and shoveling while I was getting dragged around the yard by the tiller we rented.  Needless to say, we took advantage of the rainy weekend and rested up.

On Monday, the guys were back to complete the excavation.  The goal was to finish in time to get the footings poured.

IMG_2546 IMG_2551

IMG_2542

I’ll hand it to them: they put in a long day to get it done, and by the end of the day, the milk truck, er, concrete truck was backing in and the footings were poured.

IMG_2557 IMG_2562 IMG_2564

What an enormous undertaking, but I’m sure well worth the investment.

Like I mentioned before, it’s all happening very fast.  But in the same breath, I can’t wait until the foundation is done and we’re back on the ground.  Vanessa says it’s like living in a bouncy-castle.  Perhaps not quite that bad, but you certainly feel every wind gust and the floors spring under your feet.

I’ll keep the posts coming as quickly as I can, but remember, find Our Old Island Home on Facebook and “like” us for real-time updates.  You’ll have already known that we’ve started forming the foundation walls today.

Until next time: keep your feet on the ground!

 

7 thoughts on “Fast and furious

  1. It’s those days off that keep you healthy and sane. It took us a long time to work that one out (and a couple of hundred melt downs 🙂 ) We’re agog at what you’re achieving. All power to you!

  2. Exciting!!! Love following the progress.
    I especially like the pic of your visitors!! They look like amazing people!! 😜

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s